INNOGEO intervenes during studies preliminary to construction:
- Search for underground cavities
- Geological characterisation of the subsoil
- Seismic characterisation of the subsoil in accordance with EUROCODE 8 (MASW testings to determine Vs30 velocity)
- Vibratory nuisance measurements to proportion vibration reduction devices.
INNOGEO operates on existing buildings to:
- Detect pre-existing underground networks and structures before the start of new construction works or to map out these networks
- Survey to measure the depth of foundations (parallel seismic method)
- Vibration measurement and control because of nearby building work
- Detection of steel and reinforcements in a building as part of extension, restoration or demolition.